STRUCterre PROJECTS

Laigo Way | Hammond Park | WA

Geotechnical,Commercial & Infrastructure

Situated on a site with a high groundwater table and complex subsurface soil types, the Laigo Way project presented a number of challenges that our dedicated Geotechnical team were keen to overcome.

By providing on-site field works and management, and a final geotechnical report, strong foundations were formed for the civil team to progress. This included items such as design and documentation for the bulk earthworks, pad levels, retaining walls, and stormwater management. In addition to this, the team also carried out the internal sewer and water reticulation, providing the client with full support for Water Corporation approvals.

The layout of the development consisted of a major spine road, which was designed using 3D modelling software and included stormwater drainage measures and staggered parking facilities.

This project is a great example of our multi-disciplinary capabilities and in-house project management. The Structural and Building Services teams provided design and documentation for the multi-storey residential properties, the design for the property foundations and also the municipal services such as electrical, communications and gas.

Download Profile

Back to Case Study Listings

Project Details

Team

Geotechnical,Commercial & Infrastructure

Project Title

Laigo Way

Location

Laigo Way | Hammond Park | WA

Client

Australand Holdings

Date

29/07/2013

Project Gallery

Have questions for us?

Contact us for help now.

Mailing List

Fill in your name, email and choose your preferred
location to be added to our mailing list.

Location:

Downloads

© Structerre. All rights reserved 2012. Site by Launchpad